logo
ProjectCompleted

Regulus

Completed · Argentina

Source: International Finance Corporation (IFC)

The Rio Grande Cu-Au-Ag porphyry early exploration project is located in the high Puna of NW Argentina, 450km west of the city of Salta. The main activities currently being undertaken are trench sampling and core drilling. The property has 77 drill holes (33,000 meters) which was completed as of year-end 2008 by Antares Minerals however no resource estimate has yet been prepared. Previous work h

Status
Closed
Sector
Waste Processing and Treatment, Power Generation (CCGT), Road, Metal, Government
Location
Argentina
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Regulus

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Regulus” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Argentina. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Rio Grande Cu-Au-Ag porphyry early exploration project is located in the high Puna of NW Argentina, 450km west of the city of Salta. The main activities currently being undertaken are trench sampling and core drilling. The property has 77 drill holes (33,000 meters) which was completed as of year-end 2008 by Antares Minerals however no resource estimate has yet been prepared. Previous work has focused on the near surface, oxidized mineralization which contains respectable grades of copper and gold, including large areas of low grade with variable areas of higher grade mineralization. With the economic slowdown in 2008 Antares Minerals focused on developing other assets and has in 2011 reinitiated activities at Rio Grande by initiating a drilling program for a total of 15,000 m utilizing two diamond drills. The exploration camp (3700 meters) is located in the camp facilities of the abandoned Mina Arita Onyx which has been closed down for several years. The camps hosts up to 70 people during drilling campaigns. The exploration area is located at 4700 meters. The area is arid with precipitation of 100-200 mm per year. The project has 12 full time staff with the balance being provided by contractors of which Boart-Longyear (drilling) is the largest.The project is located in an area with existing access roads. Other infrastructure available but less accessible includes a gas pipeline extending from Salta to Chuquicamata copper mine in Chile, with a branch line to the Hombre Muerto lithium mine 75 km east of Rio Grande. A high tension power line also extends from Salta to Chuquicamata, and this line lies about 200 km from the project site.

Original sector

BC - Copper

Location

Country

Argentina

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Power Generation (CCGT), Road, Metal, Government

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project