logo

Rehabilitate Existing Sidewalks and Address Gaps for Sidewalk Development in Medicine Hat

Sector: Hospital • Location: Alberta, Canada

Source: Infrastructure Canada

Project
Completed

The Rehabilitate Existing Sidewalks and Address Gaps for Sidewalk Development in Medicine Hat Project (the Project) consists of the rehabilitation and repair of existing concrete sidewalks to address potential tripping hazards and sidewalk defects such as cracking, spalling and panel depression. The Project also includes construction of new sidewalks in areas where pedestrian connectivity does not

Status
Closed
Sector
Hospital, Cement, Road, Car parking, Government, Automotive
Location
Alberta, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Rehabilitate Existing Sidewalks and Address Gaps for Sidewalk Development in Medicine Hat

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Rehabilitate Existing Sidewalks and Address Gaps for Sidewalk Development in Medicine Hat” is an infrastructure initiative in the Hospital sector, located in Alberta, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Rehabilitate Existing Sidewalks and Address Gaps for Sidewalk Development in Medicine Hat Project (the Project) consists of the rehabilitation and repair of existing concrete sidewalks to address potential tripping hazards and sidewalk defects such as cracking, spalling and panel depression. The Project also includes construction of new sidewalks in areas where pedestrian connectivity does not currently exist, as well as installation of accessibility components such as wheelchair ramps. Rehabilitation and repairs of the sidewalks will be done in the Harlow, River Heights, and South Ridge neighbourhoods. New sidewalks will be installed in River Heights and wheelchair ramps will be installed in Southeast and Southwest Hill, North Flats, and several arterial and collector road locations.

Original sector

Active Transportation

Location

Country

Canada

State

Alberta

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Hospital, Cement, Road, Car parking, Government, Automotive

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project