Rehabilitation and Realignment of Stormwater Drains for Paget and Rolling Meadows
One of 10,000+ projects Taiyo tracks in Ontario.
Source: Infrastructure Canada
This project will include the rehabilitation of the existing Paget Municipal Drain and realignment of the existing Rolling Meadows Municipal Drain in order to alleviate flooding concerns upstream for properties located north of North Street. The project will provide a combined storm channel outlet into a common storm water drainage channel approximately 200 metres in length, in coordination with t
- Status
- Closed
- Sector
- Water Supply and Storage, Mass Transit, Cement, Waste Processing and Treatment, Rail, Road, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Rehabilitation and Realignment of Stormwater Drains for Paget and Rolling Meadows
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will include the rehabilitation of the existing Paget Municipal Drain and realignment of the existing Rolling Meadows Municipal Drain in order to alleviate flooding concerns upstream for properties located north of North Street. The project will provide a combined storm channel outlet into a common storm water drainage channel approximately 200 metres in length, in coordination with the reconstruction of North Street (Oxford County Road 20). This storm channel would allow the Town to abandon these two existing municipal drains and combine into a municipally-owned storm channel that will provide an outlet between North Street and the former Canadian Southern Railway Line. To facilitate the works, the existing 900 mm diameter Rolling Meadows Municipal Drain will be extended east from Falcon Road by installing 45 metres of 1200 mm diameter concrete storm sewer along the south side of North Street to a new common outlet location. 200 metres of the 400 mm diameter Paget Municipal Drain will be abandoned south of North Street as a result of the construction of the storm channel. A new concrete headwall will be installed at the north limit of the storm channel, immediately south of North Street, approximately 45 metres east of Falcon Road, to direct the flow from the relocated drains into the storm channel. The construction of the storm channel and the realignment of the two drains will eliminate the current flooding and erosion that occurs on adjacent lands during high intensity rainfall events by providing an unrestricted outlet for the upstream lands. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Cement, Waste Processing and Treatment, Rail, Road, Government |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
