Rehabilitation of Cannifton Stormwater Pumping Station
Sector: Tunnel • Location: Ontario, Canada
Source: Infrastructure Canada
The project will rehabilitate an aging stormwater pumping station in Belleville, Ontario. The work will involve the installation of: two submersible pumps; wet well hatches and rails; a flow meter; a control panel and a new roof. Additionally, the existing fuel tank will be removed to create the space required to for a new stand-by diesel generator to be installed. Upgrades to the HVAC system and
- Status
- Under Construction
- Sector
- Tunnel, Water Supply and Storage, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Rehabilitation of Cannifton Stormwater Pumping Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will rehabilitate an aging stormwater pumping station in Belleville, Ontario. The work will involve the installation of: two submersible pumps; wet well hatches and rails; a flow meter; a control panel and a new roof. Additionally, the existing fuel tank will be removed to create the space required to for a new stand-by diesel generator to be installed. Upgrades to the HVAC system and lighting will be completed along with mechanical and structural modifications to accommodate replacement equipment. The project will improve service reliability and ensure that the pumping station can continue removing stormwater from an underpass to prevent flooding, which can impact the safety of vehicular and pedestrian traffic. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Tunnel, Water Supply and Storage, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Tunnel projects in Canada
- Calgary Composting Facility
- Wider Waterfront
- Highway Rehab -- Bridge rehabilitation Gracey Side Rd. underpass, Lakeshore
- Highway Rehab -- Culvert rehabilitation, Bridge replacement, Culvert replacement Roseville Rd. underpass, Regional Municipality of Waterloo
- Highway Rehab -- Overhead signage Fairway Rd. underpass to Hwy 7 interchange, Kitchener
- Waverley Street Underpass at Canadian National (CN) Mainline
- Réfection du tunnel Louis-Hippolyte-La Fontaine
- Gerrard-Carlaw North – Transit-Oriented Community
