Rehabilitation of Hwy 7 Bridge Over Cnr Sw
Bidding · Saskatchewan · Last reported May 2024
Source: Dodge USA
The intent of this RFI will be to solicit feedback from industry on strategic options regarding the replacement of the deck and repair and strengthening the steel girder system of the 3 span bridge. In addition to repair and strengthening the substructure including the pier cap, pier shafts and the abutments
- Status
- Prospective
- Sector
- Steel, Bridge, Manufacturing (Industrial), Government, Road, Metal, Commercial
- Location
- Saskatoon, Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Rehabilitation of Hwy 7 Bridge Over Cnr Sw
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The intent of this RFI will be to solicit feedback from industry on strategic options regarding the replacement of the deck and repair and strengthening the steel girder system of the 3 span bridge. In addition to repair and strengthening the substructure including the pier cap, pier shafts and the abutments |
Procurement method | |
Budget |
Location
Country | Canada |
State | Saskatchewan |
City | Saskatoon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Bridge, Manufacturing (Industrial), Government, Road, Metal, Commercial |
Article published date | 2024-07-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
