logo

Rehabilitation of key infrastructure including the chlorine analyzer distribution systen and generator at the Crysler Sewage Pumping Station

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Key Infrastructure replacement and rehabilitation include the chlorine analyzer distribution system, the overhaul of the generator, the replacement and installation of an alum feed pump and replacement and installation of a new submersible pump at the lagoon. Without the rehabilitation of the existing generator, the Township would not have a back up power in the event of a power loss. Additionally

Project Information FAQ

Project Information

3 Q
The project “Rehabilitation of key infrastructure including the chlorine analyzer distribution systen and generator at the Crysler Sewage Pumping Station” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Key Infrastructure replacement and rehabilitation include the chlorine analyzer distribution system, the overhaul of the generator, the replacement and installation of an alum feed pump and replacement and installation of a new submersible pump at the lagoon. Without the rehabilitation of the existing generator, the Township would not have a back up power in the event of a power loss. Additionally, this pumping station also receives effluent from Finch’s wastewater and sanitary sewer system. Ensuring these key pieces of infrastructure are maintained and rehabilitated will impact approximately 1200 people.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data