Rehabilitation of Mount Coffee Hydroelectric Power Plant (WAPP context)

Sector: Hydro • Location: Liberia

Source: KFW Bank aus Verantwortung

Project
Completed

As a contribution to the reconstruction of the Liberian energy sector, the Mt. Coffee hydroelectric power station, which was destroyed during the civil war in 1992 and has an output of 88 MW (originally 64 MW), is to be rehabilitated as a regional priority project of the WAPP. The work includes a 66-kV switchgear and two 66-kV transmission lines, each 25 km long, leading from the power station to

Project Information FAQ

Project Information

5 Q
The project “Rehabilitation of Mount Coffee Hydroelectric Power Plant (WAPP context)” is an infrastructure initiative in the Hydro sector, located in Liberia. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

As a contribution to the reconstruction of the Liberian energy sector, the Mt. Coffee hydroelectric power station, which was destroyed during the civil war in 1992 and has an output of 88 MW (originally 64 MW), is to be rehabilitated as a regional priority project of the WAPP. The work includes a 66-kV switchgear and two 66-kV transmission lines, each 25 km long, leading from the power station to Monrovia. The project provides for a sustainable and economically favorable power supply and replaces the power supply based on diesel generators. Electricity from hydropower at the Mt. Coffee site is the cheapest alternative for generating electricity in the country. By implementing the project, electricity tariffs in Liberia, which at 0.53 USD/KWh are among the highest in Africa, can be reduced by up to 50%. Furthermore, by creating a sufficient electricity supply, the conditions for the re-electrification of the capital and the supply of electricity to rural areas will be created. By substituting diesel power, CO2 emissions are reduced sustainably. The target group is current and future electricity consumers (private households, companies, public institutions) in Liberia. In conjunction with the construction of a 1,360 km long transmission line connecting four countries (Côte d'Ivoire - Liberia - Sierra Leone - Guinea), the project also represents an important milestone for the integration of Liberia into the regional electricity network of West Africa.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data