Rehabilitation of Mount Coffee Hydroelectric Power Plant (WAPP context)
Sector: Hydro • Location: Liberia
Source: KFW Bank aus Verantwortung
As a contribution to the reconstruction of the Liberian energy sector, the Mt. Coffee hydroelectric power station, which was destroyed during the civil war in 1992 and has an output of 88 MW (originally 64 MW), is to be rehabilitated as a regional priority project of the WAPP. The work includes a 66-kV switchgear and two 66-kV transmission lines, each 25 km long, leading from the power station to
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | As a contribution to the reconstruction of the Liberian energy sector, the Mt. Coffee hydroelectric power station, which was destroyed during the civil war in 1992 and has an output of 88 MW (originally 64 MW), is to be rehabilitated as a regional priority project of the WAPP. The work includes a 66-kV switchgear and two 66-kV transmission lines, each 25 km long, leading from the power station to Monrovia. The project provides for a sustainable and economically favorable power supply and replaces the power supply based on diesel generators. Electricity from hydropower at the Mt. Coffee site is the cheapest alternative for generating electricity in the country. By implementing the project, electricity tariffs in Liberia, which at 0.53 USD/KWh are among the highest in Africa, can be reduced by up to 50%. Furthermore, by creating a sufficient electricity supply, the conditions for the re-electrification of the capital and the supply of electricity to rural areas will be created. By substituting diesel power, CO2 emissions are reduced sustainably. The target group is current and future electricity consumers (private households, companies, public institutions) in Liberia. In conjunction with the construction of a 1,360 km long transmission line connecting four countries (Côte d'Ivoire - Liberia - Sierra Leone - Guinea), the project also represents an important milestone for the integration of Liberia into the regional electricity network of West Africa. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
