logo

Rehabilitation of Napoléon Bridge at L’Avenir on Ripailles – Nicolière Road (B49)

Sector: Bridge • Location: Mauritius

Source: Road Development Authority (RDA), Mauritius (Projects)

Project
Closed

The bridge was constructed in 1965 and is located on B49 Road next to L’Avenir Temple. It is approximately 35m long and 5.5m wide and is made up of a reinforced concrete deck resting on 3 Nos. reinforced concrete beams supported by an intermediate masonry pier and masonry abutments. 

The absence of footpath along the bridge represents a potential hazard for pedestrians. The geometry of the appro

Project Information FAQ

Project Information

4 Q
The project “Rehabilitation of Napoléon Bridge at L’Avenir on Ripailles – Nicolière Road (B49)” is an infrastructure initiative in the Bridge sector, located in Mauritius. Taiyo aggregates data on it from Road Development Authority (RDA), Mauritius (Projects).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The bridge was constructed in 1965 and is located on B49 Road next to L’Avenir Temple. It is approximately 35m long and 5.5m wide and is made up of a reinforced concrete deck resting on 3 Nos. reinforced concrete beams supported by an intermediate masonry pier and masonry abutments.  The absence of footpath along the bridge represents a potential hazard for pedestrians. The geometry of the approach from La Laura/Beau Bois is below current highway standards. Moreover, the bridge shows signs of moderate structural deterioration. Hence, the need for timely rehabilitation. Click here to download Project Brief

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data