logo

Rehabilitation of Pump 5 at New Charles River Dam

One of 10,000+ projects Taiyo tracks in Massachusetts.

Source: Dodge USA

Project
Closed

This project consists of Dewatering, Inspection, Sandblasting, checking, and balancing the propeller, bearing and Repair and Recoating of Pump # 5 at New Charles River Dam Pump Station

Status
Closed
Sector
Hydro, Government, Commercial, Manufacturing (Industrial), Water Supply and Storage
Location
Boston, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Rehabilitation of Pump 5 at New Charles River Dam

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Rehabilitation of Pump 5 at New Charles River Dam” is an infrastructure initiative in the Hydro sector, located in Boston, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of Dewatering, Inspection, Sandblasting, checking, and balancing the propeller, bearing and Repair and Recoating of Pump # 5 at New Charles River Dam Pump Station

Procurement method

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Boston

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Hydro, Government, Commercial, Manufacturing (Industrial), Water Supply and Storage

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project