logo

Rehabilitation of RN1 and RN2 Road Sections and Construction of the Maroua Bypass Routes

Sector: Car parking • Location: Cameroon

Source: European Union Africa Infrastructure Trust Fund

Project
Approved

The project involves the rehabilitation of the Moutourwa - Maroua section (36 km) on the National Road 1 by strengthening the pavement comprising two lanes each of which has a width of 3.50 m and the construction of two 1.50 m roadbed shoulders including the provision of safety equipment and vertical and horizontal road signs; The construction of the Maroua bypass (7.3 km) with two lanes of 3.50 m

Project Information FAQ

Project Information

4 Q
The project “Rehabilitation of RN1 and RN2 Road Sections and Construction of the Maroua Bypass Routes” is an infrastructure initiative in the Car parking sector, located in Cameroon. Taiyo aggregates data on it from European Union Africa Infrastructure Trust Fund.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

approved

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the rehabilitation of the Moutourwa - Maroua section (36 km) on the National Road 1 by strengthening the pavement comprising two lanes each of which has a width of 3.50 m and the construction of two 1.50 m roadbed shoulders including the provision of safety equipment and vertical and horizontal road signs; The construction of the Maroua bypass (7.3 km) with two lanes of 3.50 m wide each and two roadbed shoulders of 1.50 m each and parking strips along the lane; The rehabilitation of the Magada - Yagoua section (137km) on the National Road 12 through the strengthening of a tarred road comprising two lanes 3.75 m wide each and two roadbed shoulders of 2.00 m; - The implementation of environmental protection measures; and The construction of related facilities (parking areas, urban roads, toll gates, weighing stations, reconstruction of markets, construction of safety equipment, rehabilitation of schools and health centres, reservations of channels for water, electricity, optical fibre, etc.).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data