logo

Rehabilitation of Ruzizi I & II hydro power plants project

Sector: Commercial • Location: Rwanda

Source: European Union Africa Infrastructure Trust Fund

Project

The Project concerns the technical rehabilitation and private operation of the two regional Ruzizi I and II hydropower plants (HPPs) which are situated on the Ruzizi River, the natural border river between the DRC, Rwanda and Burundi. For Ruzizi I, the electricity production is expected to increase by 7.6 MW, while Ruzizi II is expected to see an expansion of 7.8 MW, adding cheap and sustainable p

Project Information FAQ

Project Information

4 Q
The project “Rehabilitation of Ruzizi I & II hydro power plants project” is an infrastructure initiative in the Commercial sector, located in Rwanda. Taiyo aggregates data on it from European Union Africa Infrastructure Trust Fund.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project concerns the technical rehabilitation and private operation of the two regional Ruzizi I and II hydropower plants (HPPs) which are situated on the Ruzizi River, the natural border river between the DRC, Rwanda and Burundi. For Ruzizi I, the electricity production is expected to increase by 7.6 MW, while Ruzizi II is expected to see an expansion of 7.8 MW, adding cheap and sustainable power generation capacities for the region. The Project should also contribute to climate change mitigation and regional integration in an overall unstable region. A pre-requisite for development funding to the Project is the introduction of a private operation model facilitating the sustainable and cost-efficient management of the plants. To date, the technical studies for the rehabilitation are about to be finalized, however a final decision by the three states on a satisfactory rehabilitation concept for the two HPP is pending. The EU-AITF grant operation covers studies on the institutional set-up of the regional Hydro Power Plants (HPP) Ruzizi I and II, their technical rehabilitation needs as well as a technical assistance for the Great Lakes Energy Organization (EGL). The institutional study analyses necessary institutional reforms, recommends technical and commercial management options and will prepare the tender documents for the recruitment of a private operator. The technical study will identify the rehabilitation needs of the HPPs and include the preparation of tender documents. With the TA measure, adequate support shall be provided to EGL in their role as coordinator of the Ruzizi and other regional energy projects. The studies and TA measure are quasi-finalized, however given continuous differences between the States and development partners on an adequate operation model, the project and with it the institutional study, was put on hold.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data