logo

Rehabilitation of Sewage Pump Station #5 located at 59 Maple Cres in the Town of Atikokan

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Upgrade to Sewage Pump Station # 5 includes: 3 new pumps (each 50 L/s @ 16.0 Total Dynamic Head); replacement of all pipes and valves in station; two new motorized valves and piping to allow flows to be simultaneously conveyed to Sewage Pump Station and river (when needed); two new magnetic flowmeters to measure flows to Sewage Pump Station and any overflows to river; new genset; miscellaneous mec

Project Information FAQ

Project Information

4 Q
The project “Rehabilitation of Sewage Pump Station 5 located at 59 Maple Cres in the Town of Atikokan” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Upgrade to Sewage Pump Station # 5 includes: 3 new pumps (each 50 L/s @ 16.0 Total Dynamic Head); replacement of all pipes and valves in station; two new motorized valves and piping to allow flows to be simultaneously conveyed to Sewage Pump Station and river (when needed); two new magnetic flowmeters to measure flows to Sewage Pump Station and any overflows to river; new genset; miscellaneous mechanical upgrades including new barscreen and sump pump; Supervisory Control and Data Acquisitioning upgrades and programming to improve Sewage Pump Station monitoring and control capabilities; removal of old unused equipment and wiring; and upgrade of building envelope. The rationale for the project is to improve the operational capability and reliability of the station and increase the peak flow rate conveyed to Sewage Pump Station #7 during wet weather, to support the other components of the proposed Wet Weather Flow Control Plan, especially the capacity increase at Sewage Pump Station #7. The proposed Sewage Pump Station capacity upgrades will allow more flow to be conveyed to Sewage Pump Station #7 and the Sewage Pump Station; reducing the volume and frequency of untreated sewage overflows at Sewage Pump Station #5; reducing the potential for basement flooding upstream of Sewage Pump Station #5; and reducing potential impacts on the environment (from reduced overflows) and public health (from basement flooding).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data