Rehabilitation of the Beechwood Bridge
Sector: Cement • Location: Ontario, Canada
Source: Infrastructure Canada
The Project is for the rehabilitation of the Beechwood Bridge, and includes the installation of a new 20 meter span, new bearing pads, concrete deck, abutments, expansion joints and end treatments, waterproof and pave existing and new bridge deck, as well as road approach and drainage works.
- Status
- Closed
- Sector
- Cement, Waste Processing and Treatment, Bridge, Road, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Rehabilitation of the Beechwood Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project is for the rehabilitation of the Beechwood Bridge, and includes the installation of a new 20 meter span, new bearing pads, concrete deck, abutments, expansion joints and end treatments, waterproof and pave existing and new bridge deck, as well as road approach and drainage works. |
Original sector | Roads, Bridges and Trade Infrastructure |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Cement, Waste Processing and Treatment, Bridge, Road, Government |
Article published date | 2026-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
