Rehabilitation of the east access to the Centenary Bridge in Panama
Sector: Bridge • Location: Panama
Source: FCC Construction
This emergency project that was requested by the Ministry of Public Works was due to a landslide caused by the rainfall in December 2010 and includes the repairs to the Centenary Bridge access by prior stabilisation of the dual carriageway with the construction of a 1.0-metre diameter secant pile wall of up to 42 metre length. This wall was secured by 150-tonne active anchors distributed in two li
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This emergency project that was requested by the Ministry of Public Works was due to a landslide caused by the rainfall in December 2010 and includes the repairs to the Centenary Bridge access by prior stabilisation of the dual carriageway with the construction of a 1.0-metre diameter secant pile wall of up to 42 metre length. This wall was secured by 150-tonne active anchors distributed in two lines. Once the ground was stabilised, the roadway was reconstructed by a "Y" shaped reinforced concrete bridge of six spans cemented over 1.50-metre diameter piles, on which reinforced concrete capping was executed, 1.50-metre diameter piers and the deck consisting of prefabricated, pre-stressed concrete beams with 1.35-metre edge depth.In addition, other fill-in and drainage works were carried out at the slipped slope foot, with the construction of a channel and the execution of Californian drains distributed all along the slope foot. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
