logo

Rehabilitation of the east access to the Centenary Bridge in Panama

Sector: Bridge • Location: Panama

Source: FCC Construction

Project
Closed

This emergency project that was requested by the Ministry of Public Works was due to a landslide caused by the rainfall in December 2010 and includes the repairs to the Centenary Bridge access by prior stabilisation of the dual carriageway with the construction of a 1.0-metre diameter secant pile wall of up to 42 metre length. This wall was secured by 150-tonne active anchors distributed in two li

Project Information FAQ

Project Information

3 Q
The project “Rehabilitation of the east access to the Centenary Bridge in Panama” is an infrastructure initiative in the Bridge sector, located in Panama. Taiyo aggregates data on it from FCC Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This emergency project that was requested by the Ministry of Public Works was due to a landslide caused by the rainfall in December 2010 and includes the repairs to the Centenary Bridge access by prior stabilisation of the dual carriageway with the construction of a 1.0-metre diameter secant pile wall of up to 42 metre length. This wall was secured by 150-tonne active anchors distributed in two lines. Once the ground was stabilised, the roadway was reconstructed by a "Y" shaped reinforced concrete bridge of six spans cemented over 1.50-metre diameter piles, on which reinforced concrete capping was executed, 1.50-metre diameter piers and the deck consisting of prefabricated, pre-stressed concrete beams with 1.35-metre edge depth.In addition, other fill-in and drainage works were carried out at the slipped slope foot, with the construction of a channel and the execution of Californian drains distributed all along the slope foot.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data