logo

Rehabilitation of the Glasgow Street South Bridge in Conestogo

Sector: Forest Products and Packaging • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The project involves the rehabilitation of a bridge spanning approximately 0.08 km over the Conestogo River in Woolwich Township, Ontario. The scope of the project includes the replacement of roller pins, concrete repairs to abutments, piers and wingwalls, the addition of scour and erosion protection around the piers, the installation of steel girder guardrails on both sides of the approaches, the

Status
Closed
Sector
Forest Products and Packaging, Bridge, Steel, Cement, Road
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Rehabilitation of the Glasgow Street South Bridge in Conestogo

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Rehabilitation of the Glasgow Street South Bridge in Conestogo” is an infrastructure initiative in the Forest Products and Packaging sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the rehabilitation of a bridge spanning approximately 0.08 km over the Conestogo River in Woolwich Township, Ontario. The scope of the project includes the replacement of roller pins, concrete repairs to abutments, piers and wingwalls, the addition of scour and erosion protection around the piers, the installation of steel girder guardrails on both sides of the approaches, the replacement of bridge components, timber deck, corroded stringers and bracing on the south underside, the installation of additional tension cables and the repair of the top chord at all load-bearing points. The aim of the project is to increase the bridge’s load limit and extend its useful life.

Original sector

Roads, Bridges and Trade Infrastructure

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Bridge, Steel, Cement, Road

Article published date

2026-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project