logo

Rehabilitation of the INGA II hydroelectric power plant

Sector: Power Generation (CCGT) • Location: Democratic Republic of Congo

Source: KFW Bank aus Verantwortung

Project
Active

The aim of the FC project is to make a cost-effective and environmentally friendly contribution to improving the electricity supply in the Democratic Republic of Congo (DRC) and in the South African Power Pool (SAPP) in the near future. This will create the conditions for economic development and an improvement in living conditions in the country and the region. The project is part of the national

Project Information FAQ

Project Information

5 Q
The project “Rehabilitation of the INGA II hydroelectric power plant” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Democratic Republic of Congo. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The aim of the FC project is to make a cost-effective and environmentally friendly contribution to improving the electricity supply in the Democratic Republic of Congo (DRC) and in the South African Power Pool (SAPP) in the near future. This will create the conditions for economic development and an improvement in living conditions in the country and the region. The project is part of the national emergency aid program PMEDE (total cost around USD 800 million), which is also supported by WB, AfDB and EIB. The FC measure is intended to finance the rehabilitation of the substation belonging to the Inga power plants. By rehabilitating the switchgear belonging to the Inga I and II hydroelectric power plants, the electricity produced can be safely and with little loss discharged from the power plants to the entire Congolese region and to the Southern African Power Pool (SAPP). The FC project can therefore make an environmentally friendly contribution to improving the electricity supply in the DRC and in the SAPP. This will create the conditions for economic development and an improvement in living conditions in the country and the region.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data