logo

Rehabilitation of the Nangbeto hydroelectric power plant in the context of the West African Power Pool (WAPP)

Sector: Power Generation (CCGT) • Location: Togo

Source: KFW Bank aus Verantwortung

Project
Active

The program provides for the rehabilitation of the Nangbéto hydroelectric power station (65 MW) in Togo. It includes modernization measures and consulting services for planning and implementing the project. The power station was built between 1984 and 1987 with funds from German Financial Cooperation (FC) and has been supplying electricity to Togo and its neighboring country Benin since 1988. Toda

Project Information FAQ

Project Information

5 Q
The project “Rehabilitation of the Nangbeto hydroelectric power plant in the context of the West African Power Pool (WAPP)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Togo. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The program provides for the rehabilitation of the Nangbéto hydroelectric power station (65 MW) in Togo. It includes modernization measures and consulting services for planning and implementing the project. The power station was built between 1984 and 1987 with funds from German Financial Cooperation (FC) and has been supplying electricity to Togo and its neighboring country Benin since 1988. Today, Nangbéto produces by far the cheapest electricity and is the only renewable energy source used in both countries. For these reasons, the regional energy network WAPP (West African Power Pool) also considers rehabilitation a priority. The goal of the FC measure is to contribute to a reliable long-term supply of Togo and Benin with inexpensive and environmentally friendly electricity (FC module goal). By covering the electricity needs of households, public institutions and companies, the measure contributes to the sustainable economic and social development of the countries (overarching development policy goal). In addition, a positive contribution is made to global climate protection (avoidance of over 51,493 tons of CO2/year). The target group is current and future electricity consumers (private households, companies, public institutions) in Benin and Togo. The costs of the measures presented as part of the inventory review amount to EUR 8 million. Taking the measures mentioned into account, the total costs of the project amount to EUR 26.05 million. The total German contribution is EUR 23 million and is to be presented in the form of an FC grant. The recipient of the funding is the Communtauté Electrique du Bénin (CEB). The CEB is a Beninese-Togolese joint venture responsible for electricity generation, imports and transmission in both countries. The CEB's own contribution is EUR 3.05 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data