logo

Rehabilitation of the Stormwater Pond at Mayfield Road and Kennedy Road

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Rehabilitation and retrofitting of the storm water pond at Mayfield Road and Kennedy Road to restore the original operational design parameters and to meet the current standards for providing flood control and an "enhanced level of protection". The purpose of this project is to restore the original facility functions to protect the environment, enhance the ability of the region through improved te

Project Information FAQ

Project Information

4 Q
The project “Rehabilitation of the Stormwater Pond at Mayfield Road and Kennedy Road” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Rehabilitation and retrofitting of the storm water pond at Mayfield Road and Kennedy Road to restore the original operational design parameters and to meet the current standards for providing flood control and an "enhanced level of protection". The purpose of this project is to restore the original facility functions to protect the environment, enhance the ability of the region through improved technology to operate and maintain the infrastructure, improve the infrastructure efficiency and reduce long term maintenance costs. The facility was constructed to service a tributary area of 10.59 ha, being comprised of 8.24 ha of arterial road drainage and 2.35 ha of additional lands which drain to the arterial road right of way. This facility provides storm water Quality Control (Enhanced Level i.e. 80% Total Suspended Solids removal), Erosion Control and maintains Water Quantity flows below existing flow rates up to the Regional Storm. On June 6, 2008 the Ministry of the Environment issued a Certificate of Approval to the Region of Peel to construct, operate and maintain the prescribed infrastructure, including a condition (No.4) requiring the Region to properly operate and maintain the infrastructure to protect the environment. To demonstrate compliance with the Ministry of the Environment authorization, the Region operates a monitoring program. The program showed that the facility have deteriorated and that without rehabilitation, will not function as per its original design.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data