Rehabilitation of the West Access to the Americas Bridge

Sector: Bridge • Location: Panama

Source: FCC Construction

Project
Closed

With an approximate cost of 15.6 million Dollars, FCC executed the stabilisation of the western access to the Americas bridge, which was an emergency project requested by the Ministry of Public Works (MOP) to improve slope stability.The project included an investigation survey to establish its design.The survey consisted of boreholes with core recovery, testing and installation of clinometers and

Project Information FAQ

Project Information

3 Q
The project “Rehabilitation of the West Access to the Americas Bridge” is an infrastructure initiative in the Bridge sector, located in Panama. Taiyo aggregates data on it from FCC Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

With an approximate cost of 15.6 million Dollars, FCC executed the stabilisation of the western access to the Americas bridge, which was an emergency project requested by the Ministry of Public Works (MOP) to improve slope stability.The project included an investigation survey to establish its design.The survey consisted of boreholes with core recovery, testing and installation of clinometers and piezometers.Both clinometers and piezometers are still being monitored.This stabilisation, which was carried out over an average time of one year, included the following:• The Installation of sub-drainage, construction of concrete ditches and basin on the mountain side to channel the underground and surface water of the mountain side basin to the Canal. • Reconstruction of the existing piping for the water exit, from the mountain side to the Canal. A driven, 24-inch diameter, high-density polyethylene (HDPE) pipeline was installed parallel to the existing one, to guarantee drainage capacity from the mountain side to the area bordering the access highway to Veracruz, with special water-collection boxes. • Slope stabilisation using two layers of launched reinforced concrete, with subsequent installation of 12-metre passive anchors, in a 4 x 4-metre mesh. • To achieve deep stabilisation of the embankment, a cut-off wall of 1.20-metre diameter piles was constructed that was contiguous with the Veracruz access highway, followed by a crown beam and a 4.9-metre wall. After filling-in the space between the slope and the wall, the stabilisation of the deep embankment fault was achieved by providing weight on the slope foot. In order to achieve stability of the whole works, two rows of active anchors were executed on the wall, which support 150 tonnes per linear metre, with a length exceeding 50 metres. • The hidden wall face was waterproofed by constructing a ditch at its foot to collect water underground water circulating through the underground drainage. A ditch was executed along the upper part of the wall to collect surface water. • Californian drains were installed from the crown beam, with six-metre separation and length exceeding fifty metres, with a five-degree inclination.  • The final wall appearance from the Veracruz roadway was obtained with an apron from the pile cut-off wall crown beam to the water collection ditch at the roadway foot. • The final access appearance was obtained by injection below the grade line, asphalt paving, together with lesser operations. • Reforestation and seeding to control erosion.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data