Rehabilitation of the York-Durham Sewer on 16th Avenue the City of Markham
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
This project includes the application of geopolymer mortar lining system on approximately 3 kilometers of 2.462 m diameter sanitary sewer to mitigate the current infiltration into the sewer and structurally rehabilitate the sewer. This sewer is one of the main branches of the York-Durham Sewer, which conveys sewage from Aurora, Newmarket, Markham and Richmond Hill to the Duffin Creek Water Polluti
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Rehabilitation of the York-Durham Sewer on 16th Avenue the City of Markham
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes the application of geopolymer mortar lining system on approximately 3 kilometers of 2.462 m diameter sanitary sewer to mitigate the current infiltration into the sewer and structurally rehabilitate the sewer. This sewer is one of the main branches of the York-Durham Sewer, which conveys sewage from Aurora, Newmarket, Markham and Richmond Hill to the Duffin Creek Water Pollution Control Plant for treatment. The current schedule for the work indicates that a reasonable construction duration with a single crew is approximately 200 m of rehabilitation per month with the current forecasted completion date of December 2018, allowing for mobilization, commissioning, testing, etc. All efforts to expedite the completion are being explored, including, but not limited to the following: multiple crews during construction, expedited procurement process, expedited design process, etc. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
