Rehabilitation of Touchette Bridge
Sector: Forest Products and Packaging • Location: Ontario, Canada
Source: Infrastructure Canada
The rehabilitation of the Touchette Bridge, including the replacement of the structural steel floor system, timber deck, structural steel stringers, and structural steel floor beams.
- Status
- Closed
- Sector
- Forest Products and Packaging, Steel, Bridge, Road
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Rehabilitation of Touchette Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The rehabilitation of the Touchette Bridge, including the replacement of the structural steel floor system, timber deck, structural steel stringers, and structural steel floor beams. |
Original sector | Roads, Bridges and Trade Infrastructure |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Steel, Bridge, Road |
Article published date | 2026-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in Canada
- Children's and Women's Clinical Support Building
- Thorold Cogeneration Project Ontario Canada
- Surrey Biofuel Processing Facility Project
- Surrey Memorial Hospital Redevelopment and Expansion: Emergency Department and Critical Care Tower
- Hälsa
- Discovery LNG, Campbell River, British Columbia
- Evanston Centre
- 1120 Ossington
