logo
ProjectClosed

Rehoboth Pathway - Coaldale

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

The scope of work includes the installation of approximately 350m of asphalt pathway including common excavation, subgrade prep, granular basing, asphalt placement, and concrete placement. There are also minor drainage requirements including placing one (1) culvert crossing, post and chain fencing, and pedestrian signage. It is expected that the successful proponent will be able to work around exi

Status
Closed
Sector
Water Supply and Storage, Cement, Government, Car parking, Commercial, Automotive, Road, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT)
Location
Coaldale, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Rehoboth Pathway - Coaldale

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Rehoboth Pathway - Coaldale” is an infrastructure initiative in the Water Supply and Storage sector, located in Coaldale, Alberta, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The scope of work includes the installation of approximately 350m of asphalt pathway including common excavation, subgrade prep, granular basing, asphalt placement, and concrete placement. There are also minor drainage requirements including placing one (1) culvert crossing, post and chain fencing, and pedestrian signage. It is expected that the successful proponent will be able to work around existing utilities, excavate material to construct to design elevations, place the required granular...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Coaldale

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Government, Car parking, Commercial, Automotive, Road, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT)

Article published date

2025-04-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project