Reinoldi Comprehensive School / SSP SchürmannSpannel
Sector: Road
Source: ArchDaily
The different main area values such as floor area, gross floor area, and traffic area have been more than halved by the new building, although considerably more usable space is available for the students and teachers due to the forum, the cafeteria, and the school administration. Less but better!The complex is divided vertically, also visible through the façade and its materiality. The foyer, cafe
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The different main area values such as floor area, gross floor area, and traffic area have been more than halved by the new building, although considerably more usable space is available for the students and teachers due to the forum, the cafeteria, and the school administration. Less but better!The complex is divided vertically, also visible through the façade and its materiality. The foyer, cafeteria, and play center form a multipurpose communication forum on the first floor. The new school administration area is connected to the open forum. On the two upper floors, 18 classrooms with individual and team rooms are organized in coherent clusters. Some of the corridors widen conically to form self-study zones and converge on a patio garden in the center of the building.The new U-shaped building positions itself invitingly to the schoolyard but was positioned away from the street on the setback portion of the school campus. Together with the two existing gymnasiums and the science extension, the new main building forms an urban unit.Text description provided by the architects.The change in school pedagogy and the reinterpretation of teaching forms prompted the city ofDortmundto examine the location and the main building of the Reinoldi - Gesamtschule, which had been expanded in several sections but was getting on in years, for its future viability. The analysis recommended a new building and the demolition of the existing building.Another basic building block is the „GreytoGreen“ method, which was used as the basis for the concept of the new secondary school inDortmund. Why less is sometimes more becomes clear in the new secondary school building project when one also looks at and compares the pure area values and volume values. The existing building had a volume of 36,700 m³ in contrast to the new building of 21,800 m³.A library with a view of the campus and a roof terrace with a perspective of the adjacent field and forest is formed on the upper floor and is available to all users as an outdoor learning area. In addition to the first educator (teacher) and the second educator (fellow students), the building as the third educator also significantly influences the new learning climate in the new building. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
