logo

Reinoldi Comprehensive School / SSP SchürmannSpannel

Sector: Road

Source: ArchDaily

Project
Closed

The different main area values such as floor area, gross floor area, and traffic area have been more than halved by the new building, although considerably more usable space is available for the students and teachers due to the forum, the cafeteria, and the school administration. Less but better!The complex is divided vertically, also visible through the façade and its materiality. The foyer, cafe

Project Information FAQ

Project Information

3 Q
The project “Reinoldi Comprehensive School / SSP SchürmannSpannel” is an infrastructure initiative in the Road sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The different main area values such as floor area, gross floor area, and traffic area have been more than halved by the new building, although considerably more usable space is available for the students and teachers due to the forum, the cafeteria, and the school administration. Less but better!The complex is divided vertically, also visible through the façade and its materiality. The foyer, cafeteria, and play center form a multipurpose communication forum on the first floor. The new school administration area is connected to the open forum. On the two upper floors, 18 classrooms with individual and team rooms are organized in coherent clusters. Some of the corridors widen conically to form self-study zones and converge on a patio garden in the center of the building.The new U-shaped building positions itself invitingly to the schoolyard but was positioned away from the street on the setback portion of the school campus. Together with the two existing gymnasiums and the science extension, the new main building forms an urban unit.Text description provided by the architects.The change in school pedagogy and the reinterpretation of teaching forms prompted the city ofDortmundto examine the location and the main building of the Reinoldi - Gesamtschule, which had been expanded in several sections but was getting on in years, for its future viability. The analysis recommended a new building and the demolition of the existing building.Another basic building block is the „GreytoGreen“ method, which was used as the basis for the concept of the new secondary school inDortmund. Why less is sometimes more becomes clear in the new secondary school building project when one also looks at and compares the pure area values and volume values. The existing building had a volume of 36,700 m³ in contrast to the new building of 21,800 m³.A library with a view of the campus and a roof terrace with a perspective of the adjacent field and forest is formed on the upper floor and is available to all users as an outdoor learning area. In addition to the first educator (teacher) and the second educator (fellow students), the building as the third educator also significantly influences the new learning climate in the new building.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data