logo
ProjectBidding

Reisner Substation Construction

One of 10,000+ projects Taiyo tracks in Iowa.

Source: Dodge USA

The general nature of the work on which bids will be received consists of construction of a 69 kV to 13.2 kV substation. The work consists of rock work, concrete foundations and concrete work, steel, fencing, conduit and ductwork, ground grid, and buswork. This also includes the installation of Owner-furnished GOAB switches, steel structures, PTs, lightning arresters, cable trench, circuit breaker

Status
Prospective
Sector
Cement, Power Generation (CCGT), Steel, Telecommunications, Government, Metal, Commercial
Location
Webster City, Iowa, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Reisner Substation Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Reisner Substation Construction” is an infrastructure initiative in the Cement sector, located in Webster City, Iowa, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The general nature of the work on which bids will be received consists of construction of a 69 kV to 13.2 kV substation. The work consists of rock work, concrete foundations and concrete work, steel, fencing, conduit and ductwork, ground grid, and buswork. This also includes the installation of Owner-furnished GOAB switches, steel structures, PTs, lightning arresters, cable trench, circuit breakers, power cable, and connecting to power the Owner-furnished power transformer, switchgear, contro...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Iowa

City

Webster City

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Cement, Power Generation (CCGT), Steel, Telecommunications, Government, Metal, Commercial

Article published date

2024-06-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project