 The Reko Diq project (the “Project”) entails developing a greenfield open-pit mining operation with processing facilities to produce a high-quality copper-gold concentrate. The project will produce 200-250 thousand tons of copper per year. Reko Diq is one of the world's largest undeveloped copper and gold deposits, located in the Chagai district of the Balochistan province of Pakistan. The Projec

Project Information FAQ

Project Information

4 Q
The project “Reko Diq Copper” is an infrastructure initiative in the Water Supply and Storage sector, located in Pakistan. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pending

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

 The Reko Diq project (the “Project”) entails developing a greenfield open-pit mining operation with processing facilities to produce a high-quality copper-gold concentrate. The project will produce 200-250 thousand tons of copper per year. Reko Diq is one of the world's largest undeveloped copper and gold deposits, located in the Chagai district of the Balochistan province of Pakistan. The Project is 100% owned and is being developed by Reko Diq Mining Company (Private) Limited (the “Company” or “RDMC”), which is incorporated in Pakistan. RDMC is indirectly majority owned (50%) by Barrick Gold Corporation (Barrick or the “Sponsor”), a Canadian mining company listed on both the Canadian and New York Stock Exchanges, operating mines and projects in 18 countries with a history of developing large-scale assets. The Government of Balochistan (GoB) directly and indirectly owns 25% of the Company shares, with the remaining 25% being indirectly held by three Pakistani State-Owned Enterprises (SOEs): Oil and Gas Development Company Limited (“OGDCL”), Government Holdings (Private) Limited (“GHPL”), and Pakistan Petroleum Limited (“PPL”). The Reko Diq mine development includes two open pits, a processing plant, several low-grade ore stockpiles, two waste rock dumps (WRD), a tailings storage facility (TSF), a heavy fuel oil (HFO) power plant, and photovoltaic (PV) solar array, and other auxiliary infrastructure. The Project will be developed on land purchased or leased from the Government of Balochistan and does not require private land acquisition. The scope of the Project does not include the smelting and refining processes that commercial off-takers will undertake outside of Pakistan.  Raw water will be supplied to the mine site from a borefield that will abstract water from a saline groundwater aquifer located northwest of the proposed mine site, along the Pakistan-Afghanistan border. Water supply pipelines will be installed to transport water from the borefield to the process plant and accommodation facility.  Diesel generators will provide electrical power during the construction phases until the HFO and solar power stations are established. Fuel will be transported by rail to the mine from Port Qasim, located 50 km from Karachi, approximately 1400km from the mine. An overhead power transmission line (OHTL) will supply power from the mine site to the bore field. RDMC has a longer-term plan to connect to the national grid, notionally from the 15th year of operation (i.e., in 2042).  The Project will utilize existing transportation networks (road and rail), that will require upgrades and some newly constructed sections, including a spur from the mine to the main railway line. During operations, the produced concentrate will be transported from the mine to Port Qasim using existing port facilities at the Pakistan International Bulk Terminal (PIBT). An area will be leased to RDMC for the construction and operation of facilities for the storage of concentrate, and all other activities will be ancillary and operated by PIBT. The existing facilities designated for concentrate loading include a berth, mechanical equipment such as a traveling ship loader, two gantry cranes, and two conveyor belts. No additional port infrastructure will be required for the Project.  The sponsors contemplate a possible expansion of the Project to increase production to 400 thousand tons of copper per year, which include also the capacity increase of the related infrastructure (water, power, TSF). The expansion is included in the Environmental and Social Impact Assessment (ESIA), which is available for consultation at https://www.barrick.com/English/operations/reko-diq/environment/default.aspx. IFC is part of a pool of international lenders that will provide the debt financing to fund the total project cost of $6.6 billion. The proposed IFC financing includes an A Loan for up to $300 million to RDMC.                                                    

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data