Relocation Development Infrastructure Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Relocation Development Infrastructure Improvements (Woodland Heights). Work will include: installation of new infrastructure at Woodland Heights (3,900 feet of roadway) within the Village of Ontario for development outside the flood plain, including stripping and stockpiling topsoil, common excavation, clearing and grubbing, lot grading, base course, sanitary sewer, storm sewer, water main, curb a
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Road, Waste Processing and Treatment, Mass Transit, Government, Rail
- Location
- Ontario, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Relocation Development Infrastructure Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Relocation Development Infrastructure Improvements (Woodland Heights). Work will include: installation of new infrastructure at Woodland Heights (3,900 feet of roadway) within the Village of Ontario for development outside the flood plain, including stripping and stockpiling topsoil, common excavation, clearing and grubbing, lot grading, base course, sanitary sewer, storm sewer, water main, curb and gutter, asphalt paving, pavement marking, storm water basins, restoration of the work area, an... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Ontario |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Road, Waste Processing and Treatment, Mass Transit, Government, Rail |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
