logo

REM project: Financial information note

Sector: Airport • Location: Canada

Source: Caisse de dépôt et placement du Québec

Project
Unknown

With new ridership data that includes the three new downtown stations announced on November 25, 2016, CDPQ Infra is issuing a financial information note that presents projections and estimates of the expected costs and revenues of the REM project (Réseau électrique métropolitain). This note is part of the ongoing information process implemented by CDPQ Infra. This note presents, among other things

Project Information FAQ

Project Information

2 Q
The project “REM project: Financial information note” is an infrastructure initiative in the Airport sector, located in Canada. Taiyo aggregates data on it from Caisse de dépôt et placement du Québec.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

unknown

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

With new ridership data that includes the three new downtown stations announced on November 25, 2016, CDPQ Infra is issuing a financial information note that presents projections and estimates of the expected costs and revenues of the REM project (Réseau électrique métropolitain). This note is part of the ongoing information process implemented by CDPQ Infra. This note presents, among other things: data to evaluate, on a comparable basis, the costs of existing transit networks in the metropolitan area, and the REM’s estimated operating and capital costs; data allowing for an estimation of the impact of an increase in ridership and public transit service on the ARTM’s total costs, once the REM is in operation; and a structure for the reduction of the REM’s revenues per passenger-km in the event that actual ridership exceeds projections by more than 15 percent. This note is available on the CDPQ Infra website Experts from CDPQ Infra will be available to answer technical questions from media on this financial information note. Media representatives may contact Jean-Vincent Lacroix at (514) 847-2896 or [email protected]. false false false About the REM The Réseau électrique métropolitain (REM) is a new, integrated 67-km public transit network intended to link downtown Montréal, the South Shore, the West Island (Sainte-Anne-de-Bellevue), the North Shore (Laval and Deux-Montagnes) and the airport through the operation of an entirely automated and electric light rail transit (LRT) system. For more information. About CDPQ Infra CDPQ Infra aims to effectively and efficiently carry out major public infrastructure projects. Established in 2015, CDPQ Infra invests for the long term in tangible assets that generate stable, predictable returns for depositors of Caisse de dépôt et placement du Québec. It is a subsidiary of Caisse de dépôt et placement du Québec (cdpq.com), one of Canada’s leading institutional fund managers. For more information on CDPQ Infra, visit cdpqinfra.com, follow us on Twitter @CDPQInfra or consult our Facebook and LinkedIn pages.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data