logo

Removable Solar Panel System Between Railway Tracks at BLW Varanasi

Sector: Mass Transit • Location: Varanasi, Uttar Pradesh, India

Source: TechnoSports Media Group

Project
Completed

Indian Railways commissioned India's first removable solar panel system between railway tracks at Banaras Locomotive Works (BLW), Varanasi. The pilot project involves 28 bifacial monocrystalline solar panels installed on a 70-meter track section, generating 15 kWp power and 67 units of electricity daily. The panels are removable using four stainless steel Allen bolts, allowing quick disassembly fo

Status
Closed
Sector
Mass Transit, Solar, Rail, Power Generation (CCGT), Steel, Government, Metal
Location
Varanasi, Uttar Pradesh, India
Updated
22 Jul 2026
Source
TechnoSports Media Group

ConstructChat

Ask ConstructChat about Removable Solar Panel System Between Railway Tracks at BLW Varanasi

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Removable Solar Panel System Between Railway Tracks at BLW Varanasi” is an infrastructure initiative in the Mass Transit sector, located in Varanasi, Uttar Pradesh, India. Taiyo aggregates data on it from TechnoSports Media Group.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Indian Railways commissioned India's first removable solar panel system between railway tracks at Banaras Locomotive Works (BLW), Varanasi. The pilot project involves 28 bifacial monocrystalline solar panels installed on a 70-meter track section, generating 15 kWp power and 67 units of electricity daily. The panels are removable using four stainless steel Allen bolts, allowing quick disassembly for track maintenance without disrupting railway operations. The project aims to scale across India's 1.2 lakh kilometer railway network to generate clean energy and support net-zero carbon emission goals by 2030.

Original sector

Energy

Location

Country

India

State

Uttar Pradesh

City

Varanasi

Source

Source

TechnoSports Media Group

URL

More Details

Record type

Project

Sector

Mass Transit, Solar, Rail, Power Generation (CCGT), Steel, Government, Metal

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project