logo

Removal of built-up sludge at the Madoc Wastewater Lagoon to restore design volume of 1008 m3/day

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

Project
Completed

Removal of 16000 m3 of settled solids using loader and excavator to improve the quality of the discharged water. The removal works are capitalized as they extend the life of the asset.

Status
Closed
Sector
Water Supply and Storage, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Removal of built-up sludge at the Madoc Wastewater Lagoon to restore design volume of 1008 m3/day

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Removal of built-up sludge at the Madoc Wastewater Lagoon to restore design volume of 1008 m3/day” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Removal of 16000 m3 of settled solids using loader and excavator to improve the quality of the discharged water. The removal works are capitalized as they extend the life of the asset.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government

Article published date

2026-02-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project