Removal of built-up sludge at the Madoc Wastewater Lagoon to restore design volume of 1008 m3/day
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
Removal of 16000 m3 of settled solids using loader and excavator to improve the quality of the discharged water. The removal works are capitalized as they extend the life of the asset.
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Removal of built-up sludge at the Madoc Wastewater Lagoon to restore design volume of 1008 m3/day
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Removal of 16000 m3 of settled solids using loader and excavator to improve the quality of the discharged water. The removal works are capitalized as they extend the life of the asset. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
