Remove & Replace Vandenberg Lined Channel
Pre-design · Nevada · Last reported Sep 2025
Source: Dodge
Remove and replace existing concrete from Mitchell to Craig Road. Funding will be supported by the Flood District that was included in this year's annual maintenance contract. However, due to the existing workload, the first phase of the project was not started this FY. It was targeted to be completed in a 3-year phase due to the size of the Project. The City of North Las Vegas may be seeking a co
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Cement, Government
- Location
- North Las Vegas, Nevada, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Remove & Replace Vandenberg Lined Channel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove and replace existing concrete from Mitchell to Craig Road. Funding will be supported by the Flood District that was included in this year's annual maintenance contract. However, due to the existing workload, the first phase of the project was not started this FY. It was targeted to be completed in a 3-year phase due to the size of the Project. The City of North Las Vegas may be seeking a consultant to provide design services for the Remove & Replace Vandenberg Lined Channel. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | North Las Vegas |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Cement, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
