ReNew Solar Wafer Plant at Rambilli
The owner, status and timeline of this project. A free account opens every field.
Source: Power Peak Digest
ReNew will set up a 6.5 GW ingot and wafer manufacturing facility at Rambilli in Andhra Pradesh with an investment of Rs 5,400 crore. The project is expected to be commissioned within 24 months and generate over 2,100 direct and indirect jobs.
- Status
- Prospective
- Sector
- Solar, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Andhra Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Power Peak Digest
ConstructChat
Ask ConstructChat about ReNew Solar Wafer Plant at Rambilli
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ReNew will set up a 6.5 GW ingot and wafer manufacturing facility at Rambilli in Andhra Pradesh with an investment of Rs 5,400 crore. The project is expected to be commissioned within 24 months and generate over 2,100 direct and indirect jobs. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Andhra Pradesh |
Source
Source | Power Peak Digest |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2026-04-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
