Active

ReNew Wind Power Private Limited entered into an agreement with Karnataka Government, to develop 18 MW wind power project at Chikodi in Belgaum district of Karnataka. The project would be executed by ReNew Wind Energy (AP) Private Limited (RWEAP), a special purpose vehicle. The wind farm would involve the building of 9 Gamesa make wind turbines of 2MW capacity each. The electricity generated from

Status
Prospective
Sector
Automotive, Wind, Commercial, Manufacturing (Industrial), Power Generation (CCGT), Raw Materials, Government
Location
Karnataka, India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ReNew Wind Energy (AP) Private Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ReNew Wind Energy (AP) Private Limited” is an infrastructure initiative in the Automotive sector, located in Karnataka, India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ReNew Wind Power Private Limited entered into an agreement with Karnataka Government, to develop 18 MW wind power project at Chikodi in Belgaum district of Karnataka. The project would be executed by ReNew Wind Energy (AP) Private Limited (RWEAP), a special purpose vehicle. The wind farm would involve the building of 9 Gamesa make wind turbines of 2MW capacity each. The electricity generated from the project would be evacuated to the state grid. Gamesa Wind Turbines Private Limited would develop, construct, commission, operate and maintain the project. ReNew Wind Energy (AP) Private Limited (RWEAP) was expected to sell the power to industrial captive consumers located in the state through a 25-year PPA. RWEAP had already signed long-term power purchase agreements (PPAs) for 17.2 MW out of its total installed capacity of 18 MW, thereby reducing off-take risk. The price risk was also mitigated as PPAs had been signed with industrial and commercial captive consumers yielding a weighted average base tariff of INR 5.71/kWh. The tie-up of power sales with five counterparties diversified the consumer base, thereby partially mitigating the counter-party risk profile. The transmission charges would be paid by ReNew to the state transmission utility.The total capacity of 18 MW was eligible for CDM benefits under UNFCC and it was already approved. The wind farm was commissioned on 29th June 2013. The project debt was tied up post completion of the project on 21st January 2014 at a debt/equity ratio of 75/25. The estimated project cost at the time of financial closure was US$ 20.6mn (INR 1258.335mn @61 INR/USD). Financing comprised a 13-year 1-month term loan of US$ 15.6mn (INR 951mn) and sponsor equity of US$ 5mn (INR 307.335mn). The term loan had a repayment schedule of 52 quarterly installments. The loan was provided by SBI (INR500mn), and Yes Bank (INR451mn).

Original sector

Energy

Budget

Location

Country

India

State

Karnataka

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Automotive, Wind, Commercial, Manufacturing (Industrial), Power Generation (CCGT), Raw Materials, Government

Article published date

2024-05-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project