logo

ReNew Wind Energy (Karnataka) Private Limited

Sector: Automotive • Location: India

Source: World Bank Group

Project
Active

ReNew Wind Power Private Limited entered into an agreement with Karnataka Government, to develop 50.4MW wind power project at Tadas in Haveri & Darwada district of Karnataka. The project would be executed by ReNew Wind Energy (Karnataka) Private Limited, a special purpose vehicle. The wind farm would involve the building of 63 Enercon E-53 make wind turbines of 800kW capacity each.The electricity

Status
Prospective
Sector
Automotive, Wind, Commercial, Power Generation (CCGT), Power Transmission, Raw Materials, Government
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ReNew Wind Energy (Karnataka) Private Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ReNew Wind Energy (Karnataka) Private Limited” is an infrastructure initiative in the Automotive sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ReNew Wind Power Private Limited entered into an agreement with Karnataka Government, to develop 50.4MW wind power project at Tadas in Haveri & Darwada district of Karnataka. The project would be executed by ReNew Wind Energy (Karnataka) Private Limited, a special purpose vehicle. The wind farm would involve the building of 63 Enercon E-53 make wind turbines of 800kW capacity each.The electricity generated from the project would be evacuated by Southern grid of India. Enercon India Limited would develop, construct, commission, operate and maintain the project at an all-inclusive price. ReNew Wind Energy (Karnataka) Private Limited was expected to sell the power to Karnataka state electricity distribution company. The APPC (Average Power Purchase Cost) 10-year base feed-in tariff as per KERC (Karnataka State Regulator) tariff order, was US$ 0.069/Unit (INR 3.70 per unit @ 53.44INR/USD). The transmission charges would be paid by ReNew to the state transmission utility. The project attained financial closure on 2nd November 2012 at a debt equity ratio of 75/25. The estimated project cost at the time of financial closure was US$ 57.7mn (INR 3081.6 @53.4 INR/USD). Financing comprised a 14-year term loan of US$ 43.3mn (INR 2311mn) and sponsor equity of US$ 14.4mn (INR 770.6mn).The term loan had a grace period of 9 months and a repayment schedule of 50 quarterly installments including a ballooning repayment structure.The loan was priced at 10.5%. The mandated arranger was Yes Bank and the participating banks were Corporation Bank,Indian Renewable Energy Development Agency Ltd. The project started construction in April 2012 and as per company sources was commissioned in April 2013.

Original sector

Energy

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Automotive, Wind, Commercial, Power Generation (CCGT), Power Transmission, Raw Materials, Government

Article published date

2024-06-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project