logo

ReNew Wind Energy (Vashpet) Windfarm

Sector: Commercial • Location: India

Source: World Bank Group

Project
Active

In March 2012, board of ReNew Wind Power Private Limited made an investment decision to develop a 45MW wind farm located at Kolgiri and Karajangi in Vaspet villages of Sangli district of Maharashtra. The wind farm would involve the building of 30 units of Vestas V82 wind turbines with 1.5MW capacity each. The farm was expected to have a load factor of 25.57%. The electricity generated from the pro

Status
Prospective
Sector
Commercial, Wind, Power Generation (CCGT), Power Transmission, Raw Materials, Government
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ReNew Wind Energy (Vashpet) Windfarm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ReNew Wind Energy (Vashpet) Windfarm” is an infrastructure initiative in the Commercial sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In March 2012, board of ReNew Wind Power Private Limited made an investment decision to develop a 45MW wind farm located at Kolgiri and Karajangi in Vaspet villages of Sangli district of Maharashtra. The wind farm would involve the building of 30 units of Vestas V82 wind turbines with 1.5MW capacity each. The farm was expected to have a load factor of 25.57%. The electricity generated from the project would be evacuated through Northern, Eastern, Western and North-Eastern grid of India to the state grid. A EPC for the wind farm had been awarded to ReGen Powertech Private Limited in March 2012. Once the project was commissioned, ReGen would assume responsibility for turbine operation and maintenance services. ReNew Wind was expected to sell power to the state utility Maharashtra State Electricity Distribution Company Limited (MSEDCL) through a 13-year PPA. The APPC (Average Power Purchase Cost) base tariff as per MERC tariff order (dated 29 April 2011 for Wind zone 1) was US$ 0.10/Unit (INR 5.37 per unit @53.44 INR/USD) for the first 13 years of operation. The transmission charges would be paid by ReNew to the state transmission utility.The total capacity of 45MW was eligible for CDM benefits under UNFCC and validation process was completed. The Project attained financial closure on 3rd September 2013 at a debt/equity ratio of 76/24. The estimated project cost at the time of financial closure was US$ 63.2mn. Financing comprised of a US$ 48mn US Dollar term loan and sponsor equity of US$ 15.2mn (INR 893mn @ 58.6 INR/USD). The foreign currency loan of US$ 48mn was arranged by Rabobank Nederland and FMO (Nederlandse Financierings-Maatschappij voor Ontwikkelingslanden). The project had started commissioning on 26th September 2012 and completed commissioning of all turbines on 6th August 2013.

Original sector

Energy

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Wind, Power Generation (CCGT), Power Transmission, Raw Materials, Government

Article published date

2024-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project