logo

Renewable Energy Anaerobic Digester Project

Sector: Biomass • Location: Davis, California, United States of America

Source: UC Davis Projects

Project
Close

UC Davis proposes to install and operate a renewable energy anaerobic digester (READ) at a site on County Road 98 in the west campus area of UC Davis. The proposed waste-to-renewable energy facility would accept agricultural waste, animal manure and bedding, food waste from the campus dining commons, and the organic component of municipal solid waste (MSW) generated on the campus, process the wast

Project Information FAQ

Project Information

4 Q
The project “Renewable Energy Anaerobic Digester Project” is an infrastructure initiative in the Biomass sector, located in Davis, California, United States of America. Taiyo aggregates data on it from UC Davis Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

UC Davis proposes to install and operate a renewable energy anaerobic digester (READ) at a site on County Road 98 in the west campus area of UC Davis. The proposed waste-to-renewable energy facility would accept agricultural waste, animal manure and bedding, food waste from the campus dining commons, and the organic component of municipal solid waste (MSW) generated on the campus, process the waste in a biodigester, and use the biogas produced in the biodigester and the campus landfill gas to generate electricity in a microturbine. The facility would involve five primary processes: (1) material receiving and preparation; (2) anaerobic digestion; (3) refinement of biogas; (4) generation of electricity using biogas and landfill gas; and (5) effluent treatment to process and dispose of any solid or liquid byproducts of the process. The READ facility would be built in two phases. The Phase 1 facility would be designed and constructed to process up to 25 tons per day of organic wastes. Phase 2 would expand the facility to handle up to 50 tons of organic wastes per day..

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data