Renewable Energy Anaerobic Digester Project
Sector: Biomass • Location: Davis, California, United States of America
Source: UC Davis Projects
UC Davis proposes to install and operate a renewable energy anaerobic digester (READ) at a site on County Road 98 in the west campus area of UC Davis. The proposed waste-to-renewable energy facility would accept agricultural waste, animal manure and bedding, food waste from the campus dining commons, and the organic component of municipal solid waste (MSW) generated on the campus, process the wast
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | UC Davis proposes to install and operate a renewable energy anaerobic digester (READ) at a site on County Road 98 in the west campus area of UC Davis. The proposed waste-to-renewable energy facility would accept agricultural waste, animal manure and bedding, food waste from the campus dining commons, and the organic component of municipal solid waste (MSW) generated on the campus, process the waste in a biodigester, and use the biogas produced in the biodigester and the campus landfill gas to generate electricity in a microturbine. The facility would involve five primary processes: (1) material receiving and preparation; (2) anaerobic digestion; (3) refinement of biogas; (4) generation of electricity using biogas and landfill gas; and (5) effluent treatment to process and dispose of any solid or liquid byproducts of the process. The READ facility would be built in two phases. The Phase 1 facility would be designed and constructed to process up to 25 tons per day of organic wastes. Phase 2 would expand the facility to handle up to 50 tons of organic wastes per day.. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
