logo

Renewable Energy and Energy Efficiency Programme

Sector: Manufacturing (Industrial) • Location: Namibia

Source: KFW Bank aus Verantwortung

Project
Completed

The Renewable Energy and Energy Efficiency program in Namibia is used to finance environmentally and climate-relevant investments in renewable energies (generation and transmission) and energy efficiency by the state-owned energy supplier NamPower. The program consists of two phases with a total volume of EUR 45 million (Phase II stock check). Phase I (EUR 25 million) will finance the rehabilitati

Project Information FAQ

Project Information

5 Q
The project “Renewable Energy and Energy Efficiency Programme” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Namibia. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Renewable Energy and Energy Efficiency program in Namibia is used to finance environmentally and climate-relevant investments in renewable energies (generation and transmission) and energy efficiency by the state-owned energy supplier NamPower. The program consists of two phases with a total volume of EUR 45 million (Phase II stock check). Phase I (EUR 25 million) will finance the rehabilitation of the three existing turbines of the Ruacana hydroelectric power plant and the construction of the 400 kV transmission line between Gerus-Otjikoto in northern Namibia as well as two 220 kV transmission lines in an industrial and tourist region on the west coast (Khan-Lithops and Walvis Bay-Kuiseb). In Phase II (EUR 20 million), EUR 20 million should be used for demand-side energy efficiency measures. The plan was for NamPower to finance the replacement of existing light bulbs in private households with 1 million LEDs and the replacement of electric water heaters with solar systems in 20,000 households. After NamPower was able to finance the replacement of the LEDs from its own resources in 2015 and the business decision was made in spring 2016 to stop the solar project, the remaining EUR 20 million in loans and the grant were promised to be used for other FC projects to improve the drinking water supply in Namibia.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data