logo
ProjectActive

Renewable Energy Generation and Access Increase Project

Active · Marshall Islands

Source: World Bank Group

The project will increase the share of renewable energy generation, improve electricity service in targeted islands and strengthen the capacity (including gender inclusion) of key energy sector entities. The Project will fund renewable energy integration, distribution network and resilience enhancement upgrades, new hybrid mini grids, technical assistance, and implementation support. The Project a

Status
Prospective
Sector
Solar, Power Generation (CCGT), Automotive, Government
Location
Marshall Islands
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Renewable Energy Generation and Access Increase Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Renewable Energy Generation and Access Increase Project” is an infrastructure initiative in the Solar sector, located in Marshall Islands. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will increase the share of renewable energy generation, improve electricity service in targeted islands and strengthen the capacity (including gender inclusion) of key energy sector entities. The Project will fund renewable energy integration, distribution network and resilience enhancement upgrades, new hybrid mini grids, technical assistance, and implementation support. The Project activities are grouped into three components.Component 1 will support renewable integration and network upgrade. It will fund detailed studies, designs, supply, installation, commissioning, and supervision of 6.6 MW of distributed, grid-connected solar PV systems (including solar PV modules, BESS, inverters, transformers, control systems, supervisory control and data acquisition (SCADA), necessary roof strengthening or structure erection, and any other ancillary equipment) in Majuro and Ebeye grids. In addition, it will upgrade selected feeders or distribution line segments (to enable additional renewable energy transfer), replace underground cable splices by elevated sectionalizing cabinets, raise some pad-mounted transformers and switchgears above surrounding levels, and supply critical/emergency operational vehicles and equipment. Component 2 will improve the quality of electricity access in Arno and Ine Islands and add renewable energy in the generation mix for four other islands (Jaluit, Wotje, Rongrong, and Kili). It will fund detailed studies, designs, supply, construction, commissioning, and supervision of hybrid mini grids in Arno and Ine islands as well as the installation of service drops with prepaid meters and power distribution panels for in-house connection. It will also fund detailed studies, designs, supply, installation, commissioning, and supervision of solar PV panels, BESS, inverters, and controls near diesel power plants in Jaluit, Rongrong, Wotje, and Kili.Component 3 aims to strengthen the sector, increase MEC and KAJUR's capabilities, and resource MEC’s PIU adequately to execute the Project. It will provide international multi-disciplinary expertise, prepare energy efficiency regulation and e-mobility policies, conduct energy efficiency campaigns, develop a renewable energy database, and fund prefeasibility studies to identify further renewable energy investments. In addition, the component will enhance the capacity of MEC and KAJUR on design, operation, and maintenance of renewable energy technologies through a combination of international consultant expertise, and gender-sensitive apprenticeship program, internship, and retention policies. Furthermore, the component will fund consulting and non-consulting services, goods, and operating costs to enable MEC’s project implementation unit to manage the project over its duration.

Original sector

Energy and Mineral Resources

Budget

Location

Country

Marshall Islands

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Automotive, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project