Renewable Energy Integration
Sector: Mass Transit • Location: Turkey
Source: World Bank
The objective of the Renewable Energy Integration Project for Turkey is to assist Turkey in meeting its increased power demand by strengthening the transmission system and facilitating large-scale renewable energy generation. The project has four components. (1) Development of transmission infrastructure to facilitate faster development of Wind Power Plants (WPPs) component will develop three 380k
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The objective of the Renewable Energy Integration Project for Turkey is to assist Turkey in meeting its increased power demand by strengthening the transmission system and facilitating large-scale renewable energy generation. The project has four components. (1) Development of transmission infrastructure to facilitate faster development of Wind Power Plants (WPPs) component will develop three 380kV 500 MVA highly digitalized sub-stations with associated grid connection structures for evacuation of wind power in the areas of Can, Izmir and Vize. The proposed structures will include high voltage (HV) substations, HV grid interfacing equipment, smart-metering systems, feeders (underground cables), tele-metered dispatch systems, digital protection systems, supervisory systems, and automatic voltage control systems. (2) Smart-grid investments component will strengthen grid operation and management in face of higher wind energy generation. (3) Lapseki 2-Sutluce 2 380 kV Submarine Power Cable component will insure a better inter-connect wind energy locations with other parts of Turkey. (4) Strengthening of transmission networks component will cater the investment needs for 380kV bulk-transmission and 154 kV sub-transmission network expansions to meet rapidly increasing demand and supply. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
