logo
ProjectClosed

Renewable Energy Integration

One of 10,000+ projects Taiyo tracks in Turkey.

Source: World Bank

The objective of the Renewable Energy Integration Project for Turkey is to assist Turkey in meeting its increased power demand by strengthening the transmission system and facilitating large-scale renewable energy generation. The project has four components. (1) Development of transmission infrastructure to facilitate faster development of Wind Power Plants (WPPs) component will develop three 380k

Status
Closed
Sector
Mass Transit, Power Transmission, Wind, Natural Gas, Forest Products and Packaging, Power Generation (CCGT), Government
Location
Turkey
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Renewable Energy Integration

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Renewable Energy Integration” is an infrastructure initiative in the Mass Transit sector, located in Turkey. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Renewable Energy Integration Project for Turkey is to assist Turkey in meeting its increased power demand by strengthening the transmission system and facilitating large-scale renewable energy generation. The project has four components. (1) Development of transmission infrastructure to facilitate faster development of Wind Power Plants (WPPs) component will develop three 380kV 500 MVA highly digitalized sub-stations with associated grid connection structures for evacuation of wind power in the areas of Can, Izmir and Vize. The proposed structures will include high voltage (HV) substations, HV grid interfacing equipment, smart-metering systems, feeders (underground cables), tele-metered dispatch systems, digital protection systems, supervisory systems, and automatic voltage control systems. (2) Smart-grid investments component will strengthen grid operation and management in face of higher wind energy generation. (3) Lapseki 2-Sutluce 2 380 kV Submarine Power Cable component will insure a better inter-connect wind energy locations with other parts of Turkey. (4) Strengthening of transmission networks component will cater the investment needs for 380kV bulk-transmission and 154 kV sub-transmission network expansions to meet rapidly increasing demand and supply.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Turkey

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Mass Transit, Power Transmission, Wind, Natural Gas, Forest Products and Packaging, Power Generation (CCGT), Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project