Renewable Energy Integration
One of 10,000+ projects Taiyo tracks in Turkey.
Source: World Bank
The objective of the Renewable Energy Integration Project for Turkey is to assist Turkey in meeting its increased power demand by strengthening the transmission system and facilitating large-scale renewable energy generation. The project has four components. (1) Development of transmission infrastructure to facilitate faster development of Wind Power Plants (WPPs) component will develop three 380k
- Status
- Closed
- Sector
- Mass Transit, Power Transmission, Wind, Natural Gas, Forest Products and Packaging, Power Generation (CCGT), Government
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Renewable Energy Integration
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Renewable Energy Integration Project for Turkey is to assist Turkey in meeting its increased power demand by strengthening the transmission system and facilitating large-scale renewable energy generation. The project has four components. (1) Development of transmission infrastructure to facilitate faster development of Wind Power Plants (WPPs) component will develop three 380kV 500 MVA highly digitalized sub-stations with associated grid connection structures for evacuation of wind power in the areas of Can, Izmir and Vize. The proposed structures will include high voltage (HV) substations, HV grid interfacing equipment, smart-metering systems, feeders (underground cables), tele-metered dispatch systems, digital protection systems, supervisory systems, and automatic voltage control systems. (2) Smart-grid investments component will strengthen grid operation and management in face of higher wind energy generation. (3) Lapseki 2-Sutluce 2 380 kV Submarine Power Cable component will insure a better inter-connect wind energy locations with other parts of Turkey. (4) Strengthening of transmission networks component will cater the investment needs for 380kV bulk-transmission and 154 kV sub-transmission network expansions to meet rapidly increasing demand and supply. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Turkey |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Power Transmission, Wind, Natural Gas, Forest Products and Packaging, Power Generation (CCGT), Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
