logo

Renewable Energy Integration

Sector: Mass Transit • Location: Turkey

Source: World Bank Group

Project
Closed

The objective of the Renewable Energy Integration Project for Turkey is to assist Turkey in meeting its increased power demand by strengthening the transmission system and facilitating large-scale renewable energy generation. The project has four components. (1) Development of transmission infrastructure to facilitate faster development of Wind Power Plants (WPPs) component will develop three 380k

Project Information FAQ

Project Information

5 Q
The project “Renewable Energy Integration” is an infrastructure initiative in the Mass Transit sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Renewable Energy Integration Project for Turkey is to assist Turkey in meeting its increased power demand by strengthening the transmission system and facilitating large-scale renewable energy generation. The project has four components. (1) Development of transmission infrastructure to facilitate faster development of Wind Power Plants (WPPs) component will develop three 380kV 500 MVA highly digitalized sub-stations with associated grid connection structures for evacuation of wind power in the areas of Can, Izmir and Vize. The proposed structures will include high voltage (HV) substations, HV grid interfacing equipment, smart-metering systems, feeders (underground cables), tele-metered dispatch systems, digital protection systems, supervisory systems, and automatic voltage control systems. (2) Smart-grid investments component will strengthen grid operation and management in face of higher wind energy generation. (3) Lapseki 2-Sutluce 2 380 kV Submarine Power Cable component will insure a better inter-connect wind energy locations with other parts of Turkey. (4) Strengthening of transmission networks component will cater the investment needs for 380kV bulk-transmission and 154 kV sub-transmission network expansions to meet rapidly increasing demand and supply.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data