Renewable Energy Scale-up Program (CRESP)
Closed · China
Source: World Bank Group
The Renewable Energy Scale-up program for China aims to create a legal, regulatory, and institutional environment conducive to large-scale, renewable-based electricity generation, and to demonstrate early success in large-scale, renewable energy development with participating local developers in two provinces. The Project has the following components: The Institutional Development and Capacity Bui
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT), Biomass, Wind, Raw Materials, Hydro, Government, Commercial
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Renewable Energy Scale-up Program (CRESP)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Renewable Energy Scale-up program for China aims to create a legal, regulatory, and institutional environment conducive to large-scale, renewable-based electricity generation, and to demonstrate early success in large-scale, renewable energy development with participating local developers in two provinces. The Project has the following components: The Institutional Development and Capacity Building component was designed to meet national priorities and the needs of the pilot provinces to initiate the scale-up of renewable energy, and will include the following: Mandated Market Policy MMP research and implementation support; technology improvement for wind and biomass; and long-term capacity building. Two subcomponents, one for Fujian Province and one for Rudong Province, are submitted for Board approval. In Fujian, a 100 MW wind farm at Changjiang'ao, Pingtan Island. The Pingtan wind farm will consist of wind turbines, associated civil and electrical works, an extension to an existing control room, a switchyard, and a 15 km, 110 kV transmission line from the wind farm to the Beicuo substation, which will be upgraded to meet the evacuation needs of the wind farm. In Jiangsu, a 25 MW straw-fired biomass power plant at Mabei Village, Rudong County. The Rudong power plant will consist of one 110 ton per hour, high-temperature, high-pressure strawfired boiler, one 25 MW steam turbine, and associated mechanical, electrical, and civil works. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Biomass, Wind, Raw Materials, Hydro, Government, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in China
- Disheng Dunhuang 18MW PV Power Plant
- Hancheng City Sangshuping 100MW Solar Power Plant
- Longan County Zhendong 100MW Solar Power Plant Phase I
- Yumen Xinneng 50MW Molten Salt Optothermal Power Plant
- Tibet Naidong 20MW PV Power Plant
- Jimusaer County Hanergy Solar Power Plant Phase I
- Chaerhu 50MW PV Power Plant
- Lanzhou Jiang County 50MW Solar Power Plant
