logo

Renewstable Barbados Power Plant Project

Sector: Solar • Location: Barbados

Source: Inter-American Development Bank (IADB)

Project
Hold

Renewstable (Barbados) Inc. (“RSB”), a special purpose vehicle (SPV), will develop a power production facility at Harrow Plantation in St. Philip, Barbados which will provide firm capacity of 13 MW from 8am to 5pm and 8pm to 10 pm and 3MW for the remainder of the night. The electricity delivered will come from a 50 MWp Solar photovoltaic plant combined with an energy storage system using hydrogen

Project Information FAQ

Project Information

4 Q
The project “Renewstable Barbados Power Plant Project” is an infrastructure initiative in the Solar sector, located in Barbados. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

hold

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Renewstable (Barbados) Inc. (“RSB”), a special purpose vehicle (SPV), will develop a power production facility at Harrow Plantation in St. Philip, Barbados which will provide firm capacity of 13 MW from 8am to 5pm and 8pm to 10 pm and 3MW for the remainder of the night. The electricity delivered will come from a 50 MWp Solar photovoltaic plant combined with an energy storage system using hydrogen technologies for long term storage and a li-ion battery system for short-term storage. The system will generate electricity from the photovoltaic solar park and feed into the national grid and in parallel convert water to hydrogen using an electrolyzer, store the hydrogen in the form of compressed gas and then produce firm power from the hydrogen using a fuel cell. This project is expected to fully contract its capacity through a 25-year Power Purchase Agreement (“PPA”) with the national grid operator- Barbados Light and Power Company (“BLPC”). In addition, the project will house a blackbelly sheep farm (the “Project”). Subject to due diligence, IDB Invest will provide a loan of up to US$35 million as a part of the syndicated debt for RSB. The project cost is approximately US$165 million, and the requested debt financing amount from RSB is up to US$132 million. The funds raised will be used to finance, build, and commission the Project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data