Rengy Hlybochok Solar Plant
Sector: Solar • Location: Ukraine
Source: World Bank Group
Hlybochok Solar, a subsidiary of Rengy Development, developed the 1.37MW Hlybochok solar plant, Hlybochok village, Trostyanets District. The expected output was 1.7 Gwh.
Construction started in Autumn 2012, and was completed in December 2012. Ukraine maintained a feed-in tariff of UAH4.8 (US$0.58) for solar plants in until 2012, when it was cut to UAH 3.5 (US$0.43). The price is guaranteed until
- Status
- Prospective
- Sector
- Solar, Power Generation (CCGT), Power Transmission, Government, Commercial
- Location
- Ukraine
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Rengy Hlybochok Solar Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Hlybochok Solar, a subsidiary of Rengy Development, developed the 1.37MW Hlybochok solar plant, Hlybochok village, Trostyanets District. The expected output was 1.7 Gwh. Construction started in Autumn 2012, and was completed in December 2012. Ukraine maintained a feed-in tariff of UAH4.8 (US$0.58) for solar plants in until 2012, when it was cut to UAH 3.5 (US$0.43). The price is guaranteed until 2030. The tariff is paid in UAH, but guaranteed against a fixed EUR amount (pegged), to absorb currency risk. The national utility is named Electricity Company Ukraine. Total cost was unavailable, but estimated here at $3.9 million/MW, the ECA average for solar in 2011, or $5.4 million. http://www.rengydevelopment.com.ua/projects-hlybochok-Solar.html |
Original sector | Energy |
Budget |
Location
Country | Ukraine |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Power Transmission, Government, Commercial |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
