Rengy Porogi Solar Plant

Sector: Power Generation (CCGT) • Location: Queensland, Ukraine

Source: World Bank Group

Project
Active

Green Agro Service LLC, a subsidiary of Swiss firm Rengy Development, developed the 4.5 MW Porogi solar plant, Vinnitsya Region. Annual output was expected tob e 5.37 GWh. The project consisted of 18,348 solar PV modules.

Martifer Solar, subsidiary of Martifer Group, acted as EPC contractor of the project. Construction started in Summer of 2012 and the project was commissioned in November 2012. O

Status
Prospective
Sector
Power Generation (CCGT), Power Transmission, Solar, Commercial, Government
Location
Queensland, Ukraine
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Rengy Porogi Solar Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Rengy Porogi Solar Plant” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Queensland, Ukraine. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Green Agro Service LLC, a subsidiary of Swiss firm Rengy Development, developed the 4.5 MW Porogi solar plant, Vinnitsya Region. Annual output was expected tob e 5.37 GWh. The project consisted of 18,348 solar PV modules. Martifer Solar, subsidiary of Martifer Group, acted as EPC contractor of the project. Construction started in Summer of 2012 and the project was commissioned in November 2012. Output was transferred to the 110kV distribution grid via a 110/35/10kV substation and 100m long 10kV aerial transmission line - sold under the Green Tariff Law. The national utility, Energy Company of Ukraine, is a state-owned enterprise with a subsidiary by region. The Ukraine maintained a feed-in tariff for solar of UAH 4.8 (US$0.58), which was lowered to UAH 3.5 (US$0.43) in 2012. Tariff was guaranteed in EURO until 2030, paid in UAH. The project reached financial closure in October 2012. The project was financed by EBRD with a EUR5.7 million package (US$7.46 million), consisting of a EUR4.1 8 year tranche for the EBRD and a EUR1.6 million 15 year tranche from the Clean Technology Fund. http://www.rengydevelopment.com.ua/files/Porogi%20NTS-eng.pdf http://www.rengydevelopment.com.ua/projects-porogi.html

Original sector

Energy

Budget

Location

Country

Ukraine

State

Queensland

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Solar, Commercial, Government

Article published date

2024-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project