Renic Small Hydro Power Plant
Sector: Commercial • Location: Brazil
Source: World Bank Group
Carnauba Geracao de Energia S.A., a partnership of the Brazilian companies Electra Power (82%) and Triton Energia (18%), was granted the authorization to build and operate a 16-MW hydro power plant located in the state of Goias (Bonito River). The power plant was named PCH Renic.
A 30-year authorization contract was granted by the regulatory agency ANEEL in January 2008. In December 2013, the co
- Status
- Prospective
- Sector
- Commercial, Government, Hydro, Power Generation (CCGT), Steel, Manufacturing (Industrial)
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Renic Small Hydro Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Carnauba Geracao de Energia S.A., a partnership of the Brazilian companies Electra Power (82%) and Triton Energia (18%), was granted the authorization to build and operate a 16-MW hydro power plant located in the state of Goias (Bonito River). The power plant was named PCH Renic. A 30-year authorization contract was granted by the regulatory agency ANEEL in January 2008. In December 2013, the company had been granted power purchase agreements to sell electricity to distribution companies starting in 2018. The company presented a winning bid of US$ 41/MWh (BRL 136.9 MWh). The investment committed to the power plant was estimated at US$ 7 million (BRL 23.4 million). Construction works commenced in July 2012 and were nearly concluded by December 2015. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Hydro, Power Generation (CCGT), Steel, Manufacturing (Industrial) |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
