logo

Reno-Tahoe Airport New Gen A & B Concourses

Closed · Nevada · Last reported Sep 2025

Source: Dodge

Project
Closed

Full replacement of the two 2 existing B and C terminal concourses, partial passenger boarding bridge replacement, airfield pavement apron and taxiway/taxi lane work, infrastructure and utility relocation, and demolition of existing structures and pavements. Will more than double the amount of boarding bridges. Replace 23 gates and add an additional gate. Subcontractor work Scope of Work includes

Status
Closed
Sector
Road, Airport, Bridge, Power Transmission, Power Generation (CCGT), Steel, Government, Commercial, Manufacturing (Industrial)
Location
Reno, Nevada, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Reno-Tahoe Airport New Gen A & B Concourses

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Reno-Tahoe Airport New Gen A & B Concourses” is an infrastructure initiative in the Road sector, located in Reno, Nevada, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Full replacement of the two 2 existing B and C terminal concourses, partial passenger boarding bridge replacement, airfield pavement apron and taxiway/taxi lane work, infrastructure and utility relocation, and demolition of existing structures and pavements. Will more than double the amount of boarding bridges. Replace 23 gates and add an additional gate. Subcontractor work Scope of Work includes but is not limited to the Following: Structural Demolition, Selective Demolition, Remediation/Aba...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Nevada

City

Reno

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Airport, Bridge, Power Transmission, Power Generation (CCGT), Steel, Government, Commercial, Manufacturing (Industrial)

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project