logo
ProjectActive

Renova Crushing

Active · Argentina

Source: International Finance Corporation (IFC)

Renova is a 50/50 soybean crushing joint venture between Vicentin S.A.I.C. (“Vicentin”, an existing IFC client) and Oleaginosa Moreno Hermanos S.A. (“OMHSA”) with a crushing capacity of 20,000 metric tons per day (MT/day). Renova works under a tolling crushing agreement with Vicentin and OMHSA. Soybean reception is 1,400 MT/hour (delivered by ~1,000 trucks/day) and it produces 42,000 tons lecithin

Status
Prospective
Sector
Raw Materials, Residential, Road, Water Supply and Storage, Power Generation (CCGT), Consumer Products, Government, Warehouse, Manufacturing (Industrial), Oil and Gas, Car parking, Commercial, Automotive
Location
Argentina
Updated
19 Nov 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Renova Crushing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Renova Crushing” is an infrastructure initiative in the Raw Materials sector, located in Argentina. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Renova is a 50/50 soybean crushing joint venture between Vicentin S.A.I.C. (“Vicentin”, an existing IFC client) and Oleaginosa Moreno Hermanos S.A. (“OMHSA”) with a crushing capacity of 20,000 metric tons per day (MT/day). Renova works under a tolling crushing agreement with Vicentin and OMHSA. Soybean reception is 1,400 MT/hour (delivered by ~1,000 trucks/day) and it produces 42,000 tons lecithin/year; storage (silo’s and flat storage) capacity for beans is 300,000 MT; meal: 170,000 MT; husk: 20,000 MT; oil: 43,500 MT. From the terminal the following shipments are possible: meal: 3,800 MT/hour; oil: 1,100 MT/hour. The facility has its own steam/power co-generation plant with a capacity of 30 MW.  The proposed project entails a loan of up to US$410m for the proposed expansion of new grain storage capacity (115,500 MT), a new flat silo (250,000 MT for soybean/grains), construction of a new berth that will expand the port loading capacity (4,000 MT/hour), new unloading capacity of 9,000 MT/day in barge terminal an upgrade of the grain reception area (to facilitate an additional unloading capacity ~500 trucks/day), new services: (i) cleaning 650 MT/hour, and (ii) drying 200 MT/hour, and a third soybean crushing line (10,000 MT/day). The existing operations and expansion will both be housed within the existing Renova facility footprint, covering 200 hectares in Timbues, San Lorenzo district, Santa Fe Province, Argentina on the right bank of the Coronda river. The area is zoned industrial/agricultural. To the south there are two other crushing facilities and to the north the facility borders a power plant. The current operations consists of the a truck parking lot;  truck dumpers, preparation and extraction building (production lines), meal grinding, warehouses, silo and flat storage, water treatment and waste water treatment plant, fuel oil and lecithin tanks, steam and power generation plant, conveyor belts tunnels and port infrastructure (terminal) , canteen, office and administration blocks. At the time of IFC’s site visit in January 2017, construction of the second port terminal, barge terminal transport systems, parking areas dumping areas and storage was ongoing. The construction of the third line is expected to commence in Q2 2017.

Original sector

F-AC - Vegetable Fats and Oils

Location

Country

Argentina

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Raw Materials, Residential, Road, Water Supply and Storage, Power Generation (CCGT), Consumer Products, Government, Warehouse, Manufacturing (Industrial), Oil and Gas, Car parking, Commercial, Automotive

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project