Translated version of this PSD: Russian The EBRD is considering providing a RUB 3 billion (€75 million) facility to participate alongside Sberbank of Russia on a risk sharing basis in loans extended (or to be extended by 2015) to ZAO “Teplosetevaya Compania”, ZAO “Vodosnabzhauschaya Compania”, and ZAO “Electrosetevya Compania”, wholly owned subsidiaries of Renova StroyGroup. The loans will be used

Status
Closed
Sector
Water Supply and Storage, Government, Power Generation (CCGT), Residential, Waste Processing and Treatment, Power Transmission, Commercial
Location
Russia
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Renova StroyGroup-Academicheskiy

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Renova StroyGroup-Academicheskiy” is an infrastructure initiative in the Water Supply and Storage sector, located in Russia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

cancelled

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Translated version of this PSD: Russian The EBRD is considering providing a RUB 3 billion (€75 million) facility to participate alongside Sberbank of Russia on a risk sharing basis in loans extended (or to be extended by 2015) to ZAO “Teplosetevaya Compania”, ZAO “Vodosnabzhauschaya Compania”, and ZAO “Electrosetevya Compania”, wholly owned subsidiaries of Renova StroyGroup. The loans will be used for essential utility (water, wastewater, district heating and electricity distribution) infrastructure development within the framework of the Academicheskiy affordable housing project. Phase 1 of the project entails the development of 2.2 million square metres of affordable housing with related social infrastructure and will accommodate up to 70,000 people by 2017 in the vicinity of the city of Ekaterinburg in the Urals federal district of the Russian Federation. Transition impact potential comes from: Renova StroyGroup acting through 3 wholly owned limited liability companies: OOO “Teplosetevaya Compania” (district heating utility); OOO “Vodosnabzhauschaya Compania” (water and wastewater utility); and OOO “Electrosnabzhauschaya Compania” (electricity distribution utility). Sberbank of Russia is the main external creditor to finance the investment activities of the client through provision of medium and long term loan facilities. EBRD facility to participate on a 50 per cent risk sharing basis in the Sberbank loans extended to the 3 borrowers for a maximum amount of RUB 3 billion (€75 milllion). Up to RUB 7.5 billion (€187.5 million) Categorised B. The independent environmental and social due diligence assessed the Project impacts within its Area of Influence: the Academicheskiy development. Some of the benefits include introducing energy efficient buildings that reduce the consumption of energy by about 30 per cent; installing heat substations at each building level and thermostats in each flat that will enable households regulating consumption of heat. The Client has developed and introduced a corporate Green Standard on environmental audit and voluntary environmental certification of the design, construction, refurbishment and operation of real estate, which sets procedures for monitoring and assessing environmental protection and rational use of resources. However, Renova StroyGroup Academicheskiy and Renova StroyGroup Engineering Infrastructure subsidiaries do not have any environmental, health and safety management systems in place. While management of Renova StroyGroup Engineering Infrastructure and of the district heating plant Akademenergo are aware about the importance of the environment, health and safety issues, there are some compliance issues associated with the operation of the district heating plant Akademenergo with incomplete permitting process and delayed payment of pollution fees. Waste management also requires significant improvement. Ongoing construction impacts are associated with the high dust levels, increased noise from the construction machinery, poor waste storage and unfenced trenches and foundations that pose community safety risks. There are also issues with provision of adequate accommodation to the migrant construction personnel, hired by the general construction contractor. While the Client carried out public consultation under Russian law and is pro-active on promoting the benefits of the new development, their efforts need to be expanded to provide timely information on the adverse impacts of the project and proposed mitigation measures to the stakeholders. An Environmental and Social Action Plan has been developed that contains mitigation measures for all identified impacts. Consultants have also developed a Stakeholders Engagement Plan providing a detailed framework for identifying and engaging with stakeholders. None. Mr. Alexei Migalin, Deputy CFO, Corporate Finance Phone: +74957558081 (ext.5216) Email: A.Migalin@renova-sg.ru

Original sector

Municipal Infrastructure

Location

Country

Russia

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Power Generation (CCGT), Residential, Waste Processing and Treatment, Power Transmission, Commercial

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project