Renovate Ice House - Beto Unit REBID
Bid results · Texas · Last reported Jan 2025
Source: Dodge
The TDCJ is seeking proposals for the renovation of the icehouse at the Beto Unit by removing existing equipment and refrigerant (ammonia), covering existing ice block pit with concrete flooring and coating, installing insulated paneling to existing freezer, add new roof membrane, lighting, installing new ice machines, new evaporator in the freezer, new electrical and paneling, plumbing including
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Power Generation (CCGT), Commercial, Hydrogen, Raw Materials, Manufacturing (Industrial)
- Location
- Tennessee Colony, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Renovate Ice House - Beto Unit REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The TDCJ is seeking proposals for the renovation of the icehouse at the Beto Unit by removing existing equipment and refrigerant (ammonia), covering existing ice block pit with concrete flooring and coating, installing insulated paneling to existing freezer, add new roof membrane, lighting, installing new ice machines, new evaporator in the freezer, new electrical and paneling, plumbing including running new chill water piping tap lines, concrete work for cut paving repair and other work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Tennessee Colony |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Power Generation (CCGT), Commercial, Hydrogen, Raw Materials, Manufacturing (Industrial) |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
