logo

Renovation of Huangpu River Yangpu Bridge Water Quality Automatic Monitoring Station / TJAD Atelier L+

Sector: Steel • Location: China

Source: ArchDaily

Project
Closed

Text description provided by the architects.Huangpu River Yangpu Bridge Water Quality Automatic Monitoring Station is located in Yangpu Riverside of Huangpu River. The base is surrounded by several historical buildings, including the historical protection building Sanxin Cotton Mill on the north side, the historical protection building Shanghai Power Station Auxiliary Equipment Factory on the east

Project Information FAQ

Project Information

3 Q
The project “Renovation of Huangpu River Yangpu Bridge Water Quality Automatic Monitoring Station / TJAD Atelier L+” is an infrastructure initiative in the Steel sector, located in China. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Text description provided by the architects.Huangpu River Yangpu Bridge Water Quality Automatic Monitoring Station is located in Yangpu Riverside of Huangpu River. The base is surrounded by several historical buildings, including the historical protection building Sanxin Cotton Mill on the north side, the historical protection building Shanghai Power Station Auxiliary Equipment Factory on the east side, and the newly renovated Party and Mass Service Station on the west side. The project is a small building in the rich industrial heritage complex.The basic strategy of the renovation is "maximum preservation and lightweight intervention". The above and underground parts of the building are maximum preserved, including the texture of the main station and underground space with concrete as the main material. A bamboo steel structure corridor is added around the station. Design adapts to structural constraints and creatively intervenes in space transformation. An important design strategy is the vertical connection between the above-ground and underground space. Water intake pipes are set up at the edge of the Huangpu River from the above-ground station, which is directly connected to the water of the Huangpu River through the outside of the flood control wall.The realization of the goal of the project "net zero carbon water quality monitoring station" depends on the integration of comprehensive environmental analysis and regulation technologies. Maximizing the use of renewable energy is the key to ensuring net zero carbon throughout the life cycle. The design adopts an innovative optical hydrogen storage micro-grid system, which is composed of a photovoltaic power generation subsystem, lithium energy storage subsystem, hydrogen electrolysis power storage subsystem, and energy management system. Combined with the partial waterproofing and renovation of the wall of the underground space of the building, the capillary tunnel is buried together with the structure, and the capillary air conditioning system is used to create a comfortable indoor heat and humidity environment. The design combines the architectural function and environmental characteristics and sets up an outdoor exhibition area with the theme of "water" open to the public.The original monitoring station house has been abandoned for many years. The station house on the ground is 5m long and 12m wide, surrounded by a crumbling courtyard and a landscape tree pool. Underground is an abandoned sewage treatment pond. Its original structure is intact, including a collection pond, a sludge pond, and a two-foot pond. The 380m2 underground building forms an underground concrete box structure.The design preserves the site and the building's historical footprint while giving it new functions and innovative green technology, aiming to build a "net zero carbon water quality monitoring station" that achieves its design goals through integrated active and passive technology and whole-process calculation. One of the biggest challenges is to achieve the net zero carbon goal of energy self-sufficiency through "Thermodynamic Technology" and "Solar and hydrogen Energy Storage Micro-grid Systems".

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data