logo

Renovation of the Francisco Morazán Hydropower Plant to Facilitate the Integration of Renewable Energy

Sector: Power Generation (CCGT) • Location: Honduras

Source: Inter-American Development Bank (IADB)

Project
Implementation

The general objective of the program is to improve and recover the role of the Francisco Morazán hydroelectric power station (CHFM by its acronym in Spanish) as an effective asset to provide flexibility and integration of variable renewable energy (ERV) to the Honduran electricity system. The specific objectives are: (i) to improve the plant's operational reliability and efficiency as an asset to

Project Information FAQ

Project Information

5 Q
The project “Renovation of the Francisco Morazán Hydropower Plant to Facilitate the Integration of Renewable Energy” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Honduras. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

implementation

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The general objective of the program is to improve and recover the role of the Francisco Morazán hydroelectric power station (CHFM by its acronym in Spanish) as an effective asset to provide flexibility and integration of variable renewable energy (ERV) to the Honduran electricity system. The specific objectives are: (i) to improve the plant's operational reliability and efficiency as an asset to increase ERV's participation in the National Interconnected System (SNI) and its integration to the System Operator (OdS); (ii) have techincal studies to evaluate the increase in its generation capacity; and (iii) strengthen the local capacity and operative units of the plant.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data